Created 10-Jan-14
Modified 6-Jan-24
As work continued on the Bishop Auckland branch line, work focussed on the bend leading from Newton Aycliffe station round towards Heighington. Here the line to Simpasture would have carried on, but now, its a cutting and bend, quite normal in many ways.
Here, pictures of the engineering work can be seen as track is replaced on both lines.
Category:
Subcategory:
Subcategory Detail:
Keywords:
© The Black Hat